skip to Main Content

Route 5 bus is detoured off Oak Hill Road onto Shea to Pratt to St. Joseph's to Legros to Beech to and from Park Hill Plaza. The route 2 bus is detoured up Hospital Hill Road to Chandler to upper Nelson to Memorial back onto to Hospital Hill Road outbound towards Monument Square. The route 2 bus inbound to Fitchburg cannot service Leominster Hospital as The lower end of Nelson Street is closed.

MART Ayer Demo Project# RFR 10-13-2017 DEMO

The Montachusett Regional Transit Authority is requesting proposals from qualified contractors/vendors for the above RFR. The structure to be demolished is located at 70 Main St. in Ayer, Massachusetts toward the rear of the parking lot, nearest the MBTA platform. The structure is a single story, block building, with a flat roof. The estimated dimensions 100’L x 45’W x 12’H. There are two electric services and two gas meters that will need to be cut and capped.

Release Date:
Friday, October 13, 2017
Due Date:
Thursday, October 26, 2017
Awarded to Company:
Bourgeois Wrecking and Excavation, Inc
Awarded on Date:
Wednesday, November 8, 2017
Pre-Proposal Site Visit:
Pre-site visit at 70 Main Street Ayer, MA on October 20th at 10:00 a.m.

This opportunity is now closed. If you would like a copy of the documents, send a message to Procurement@mrta.us

Return to the Contracting Opportunities page.

Back To Top